Image 1 of 1
40-Year Recertification Cost - Complete Package Minimum
P.E. #67462 · Level III CIT® #19397 · Engineering Business Registry #28738 · Miami.
Call (786) 318-7203. Request a same-day estimate.
40-Year Recertification Cost - Complete Package Minimum - ★★★★★ 5.0 from 57 verified Google reviews · 100% first-pass acceptance · P.E. #67462 · CIT® #19397 · Hablamos Español.
The complete package minimum is $5,600: structural, electrical, infrared thermography, and parking lot illumination. Each specialty is priced on its own.
Structural inspection: $1,600.
Electrical inspection: $1,600.
Infrared thermography: $1,600 minimum, covering up to 10 pieces of equipment; then $160 per piece up to 20 pieces, and $80 per additional piece.
Parking lot illumination: $800.
Parking guardrail: $800 alone, or free with a structural or electrical inspection.
Re-inspection: $800 or 25% of that specialty’s original fee, whichever is greater, per building; infrared re-inspection $800 for up to 5 pieces, plus $80 per additional piece.
These minimums apply to a building of 3 to 4 units and 2 stories. Larger buildings are priced by square feet, stories, and units, and you approve a written proposal before any work starts.
Read the 40-year recertification Miami-Dade guide.
📞 (786) 318-7203 · ✉ info@allhomemeters.com · Hablamos Español.
What affects the 40-year recertification cost?
Building size: square feet, number of stories, and number of units.
Electrical service: an infrared scan is required when the service is 400 amperes or more, and its price grows with the number of pieces of equipment, such as panels, disconnects, and meter centers.
Parking lot: illumination is checked when the building has a parking lot, and a guardrail certification is needed when the lot is next to water.
Repairs: repair work is not included; contractors quote it separately, and a re-inspection follows at the rates above.
Filing fees: the County or city building department charges its own filing fees, paid separately. See the County Fee Schedule.
What the 40 year recertification cost includes.
On-site inspection by Florida-registered structural and electrical engineers.
Structural and electrical reports on the Miami-Dade County report templates, with photos.
Infrared thermography report when the electrical service is 400 amperes or more, by a Level III thermographer who is also an engineer.
Parking lot illumination report when the building has a parking lot.
Reports digitally signed and sealed by the engineer.
A list of deficiencies, so contractors can quote the repairs.
What is not included.
Repairs, quoted separately by contractors.
County or city filing fees.
Filing the reports with the building department.
Removing panel covers, done by an electrician, whose price usually starts at about $250.
Re-inspections, at the rates above.
Is the price fixed? Yes. You approve a written proposal before any work starts, and the price changes only if the scope changes.
How long does it take? We schedule the inspection within one week. The report, or the list of deficiencies, is ready within 3 business days, usually on the same day as the inspection.
How do I get an exact price? Send the address or folio number. We use the property appraiser data and send you a written proposal before any work starts.
Do you file the reports? No. You file the signed and sealed reports with your building department.
Which equipment needs infrared thermography? Equipment fed by an electrical service of 400 amperes or more, even when the equipment itself is rated lower. Read the Miami-Dade County memo.
Do condominium unit panels need thermography? No. The updated County guidelines say the unit electrical panel does not need a thermographic inspection, which keeps the price lower. See the Miami-Dade County presentation.
Who can do the infrared inspection? A certified infrared thermographer, Level II or higher, trained to find and document heat problems in electrical systems. Ours are Level III and engineers. Read the County rules board interpretation.
What happens if the building is found unsafe? The Building Official sends the case to the Miami-Dade County Unsafe Structures Board. Read more.
P.E. #67462 · Level III CIT® #19397 · Engineering Business Registry #28738 · Miami.
Call (786) 318-7203. Request a same-day estimate.
40-Year Recertification Cost - Complete Package Minimum - ★★★★★ 5.0 from 57 verified Google reviews · 100% first-pass acceptance · P.E. #67462 · CIT® #19397 · Hablamos Español.
The complete package minimum is $5,600: structural, electrical, infrared thermography, and parking lot illumination. Each specialty is priced on its own.
Structural inspection: $1,600.
Electrical inspection: $1,600.
Infrared thermography: $1,600 minimum, covering up to 10 pieces of equipment; then $160 per piece up to 20 pieces, and $80 per additional piece.
Parking lot illumination: $800.
Parking guardrail: $800 alone, or free with a structural or electrical inspection.
Re-inspection: $800 or 25% of that specialty’s original fee, whichever is greater, per building; infrared re-inspection $800 for up to 5 pieces, plus $80 per additional piece.
These minimums apply to a building of 3 to 4 units and 2 stories. Larger buildings are priced by square feet, stories, and units, and you approve a written proposal before any work starts.
Read the 40-year recertification Miami-Dade guide.
📞 (786) 318-7203 · ✉ info@allhomemeters.com · Hablamos Español.
What affects the 40-year recertification cost?
Building size: square feet, number of stories, and number of units.
Electrical service: an infrared scan is required when the service is 400 amperes or more, and its price grows with the number of pieces of equipment, such as panels, disconnects, and meter centers.
Parking lot: illumination is checked when the building has a parking lot, and a guardrail certification is needed when the lot is next to water.
Repairs: repair work is not included; contractors quote it separately, and a re-inspection follows at the rates above.
Filing fees: the County or city building department charges its own filing fees, paid separately. See the County Fee Schedule.
What the 40 year recertification cost includes.
On-site inspection by Florida-registered structural and electrical engineers.
Structural and electrical reports on the Miami-Dade County report templates, with photos.
Infrared thermography report when the electrical service is 400 amperes or more, by a Level III thermographer who is also an engineer.
Parking lot illumination report when the building has a parking lot.
Reports digitally signed and sealed by the engineer.
A list of deficiencies, so contractors can quote the repairs.
What is not included.
Repairs, quoted separately by contractors.
County or city filing fees.
Filing the reports with the building department.
Removing panel covers, done by an electrician, whose price usually starts at about $250.
Re-inspections, at the rates above.
Is the price fixed? Yes. You approve a written proposal before any work starts, and the price changes only if the scope changes.
How long does it take? We schedule the inspection within one week. The report, or the list of deficiencies, is ready within 3 business days, usually on the same day as the inspection.
How do I get an exact price? Send the address or folio number. We use the property appraiser data and send you a written proposal before any work starts.
Do you file the reports? No. You file the signed and sealed reports with your building department.
Which equipment needs infrared thermography? Equipment fed by an electrical service of 400 amperes or more, even when the equipment itself is rated lower. Read the Miami-Dade County memo.
Do condominium unit panels need thermography? No. The updated County guidelines say the unit electrical panel does not need a thermographic inspection, which keeps the price lower. See the Miami-Dade County presentation.
Who can do the infrared inspection? A certified infrared thermographer, Level II or higher, trained to find and document heat problems in electrical systems. Ours are Level III and engineers. Read the County rules board interpretation.
What happens if the building is found unsafe? The Building Official sends the case to the Miami-Dade County Unsafe Structures Board. Read more.

