30/40-Year Recertification Miami-Dade County: Building Inspections Compliance Guide FAQs.

Updated November 06, 2025. Expertly reviewed and verified by Armando Longueira, P.E. (Florida Professional Engineer License #67462).

Don't wait until it is too late. Contact our licensed engineering team today for a free 15-minutes consultation.

GET YOUR FAST, FREE QUOTE NOW

Call Us Directly: 786-318-7203 (Hablamos Español)

General Overview.

  • A 40-Year Recertification is a historical term for mandatory structural and electrical safety inspections formerly required in South Florida counties and now largely superseded by the statewide Milestone Structural Inspection law.

  • Its goal is to proactively identify and address potential safety issues in aging buildings to prevent failures and ensure continued occupant safety in Florida's challenging environment.

  • Exempt buildings typically include single-family homes, duplexes, and structures under a specific size/occupant load threshold, though exemptions are subject to local ordinance.

  • While local ordinances govern specifics, in Miami Dade County, buildings smaller than 2,000 square feet or with fewer than 10 occupants are commonly exempt.

  • Post-Surfside, Florida strengthened inspection standards, expanded the scope to mandatory statewide Milestone Inspections, increased penalties, and mandated thorough electrical and structural evaluations.

  • SB 4-D and HB 913 replaced the 40-year building recertification program with mandatory statewide Milestone Structural Inspections, lowering the initial inspection age to 25 or 30 years and mandating full funding for structural reserves.

  • Building owners are notified via official certified mail from local authorities based on the building's original Certificate of Occupancy (CO) date, but owners are ultimately responsible to search in public records even without a notice.

  • Local county or city code enforcement officials issue the Notice of Required Inspection, typically sending it to the owner or association at least 90 days prior to the due date.

  • After the initial Milestone Inspection (due at 25 or 30 years), recertification is required every 10 years thereafter.

  • Non-compliance results in immediate escalating fines (up to $10,000), legal liability, potential liens on the property, and possible orders for building suspension or evacuation.

  • If a building fails, owners must obtain permits and complete all required repairs within mandated timelines (often 180-365 days) or face severe enforcement actions, including condemnation.

  • No; the mandatory inspection specifically focuses on structural integrity and life-safety electrical systems, typically excluding cosmetic or non-critical maintenance issues.

Choosing the Professional and Qualifications for Engineer/Architects

  • Inspections must be performed by a Florida-licensed Professional Engineer (P.E.) or Registered Architect with documented experience in structural and electrical assessments.

  • Yes, owners may select any qualified licensed professional, but verifying credentials against state requirements is mandatory.

  • Credentials are verified through the online license lookup tool provided by the Florida Department of Business and Professional Regulation (DBPR) on MyFloridaLicense.com.

  • The primary verification source is the Florida DBPR website (MyFloridaLicense.com), checking licenses issued by the Florida Board of Professional Engineers (FBPE) and the Florida Board of Architecture and Interior Design (BOAID).

  • For Threshold Buildings, the structural inspection must be done by a Florida-licensed Structural Engineer, and the electrical portion by a licensed Electrical Engineer. Registered Architects are generally excluded from inspecting threshold structures.

    ‍ ‍

  • Structural Engineers must provide proof of passing the 16-hour Structural Test, or specific combinations of the 8-hour Structural I or Civil exams, or hold specific state recognition programs, alongside relevant experience.

  • Threshold Building?A "Threshold Building" is defined by Florida Statute 553.71 as any building greater than three stories or 50 feet in height, or one with a large assembly occupancy exceeding 5,000 sq. ft. and 500 persons.

  • Falsifying reports can lead to license revocation, significant professional fines, and potential criminal charges for the engineer or architect involved.

  • Yes, most local jurisdictions now require or strongly encourage electronic submission via designated online portals for efficiency.

  • Yes, digital portals improve compliance by providing clear audit trails, immediate confirmation of receipt, and reducing manual processing errors.

  • Repairs must be performed by licensed contractors appropriate to the scope of work (e.g., General, Building, or Electrical Contractors) who pull the necessary local building permits.

Cost and Preparation

  • Owners should prepare 6 to 12 months in advance by reviewing maintenance records, budgeting for inspection/repairs, and educating tenants about the mandatory process.

  • The most common issues identified are concrete spalling/corroded rebar, moisture intrusion, deteriorated roofing, and outdated/overloaded electrical panels.

  • The initial inspection cost typically ranges from $2,800 to over $8,000 for mid-sized buildings, with costs scaling significantly higher for high-rise structures.

  • Repair costs are highly variable, ranging from minor system fixes to major structural overhauls costing hundreds of thousands or millions of dollars.

  • Yes, specialized financing options exist, often through commercial lenders, and associations can utilize required Structural Integrity Reserve Study (SIRS) funds or levy special assessments.

  • Budgeting must account for three main expenses: the inspection fee, the cost of any required repairs, and a contingency fund for unforeseen issues uncovered during Phase Two testing.

  • Owners must retain the original Certificate of Occupancy (CO), all past inspection reports, final repair permits, and records of the mandatory Structural Integrity Reserve Study (SIRS).

  • Owners can track deadlines through direct notifications from the local building department and by referencing the Certificate of Occupancy date against the state's 25/30-year schedule.

  • No, recertification fees are not standardized; they vary significantly between local jurisdictions based on their administrative and filing costs.

  • The building's property owner or the condominium/cooperative association is legally responsible for arranging and funding the entire process.

  • Qualified professionals are found by verifying Florida licensure through the DBPR website and prioritizing engineers/architects with specific, documented experience in milestone inspections and South Florida building codes.

  • Planning involves completing a proactive Structural Integrity Reserve Study (SIRS) to fund long-term needs and integrating high-cost items into the annual budget to avoid large, sudden special assessments.

Inspection Process.

  • Inspections assess structural integrity, electrical systems (including service rated $\ge 400A$), roofing, foundations, and safety components like parking lot guardrails and illumination.

  • A Florida-licensed professional engineer or architect with relevant expertise conducts the evaluation.

  • No; the local government reviews and accepts the sealed, certified reports submitted by the private design professional.

  • From initial notice to final report submission, it typically takes up to 90 days, but repairs can extend the total compliance timeline by 6 to 18 months or more.

  • Owners must contact and contract a qualified Florida-licensed engineer or architect well in advance of the deadline and coordinate access with tenants/management.

  • Full and unrestricted access to all critical structural and electrical areas of the building, including individual units if necessary for structural assessment, is required.

  • Handling tenant cooperation involves providing written notice well in advance, clearly explaining the mandatory safety nature of the inspection, and securing access through the association's authority or the courts if denied.

  • If access is denied, the owner/association faces immediate fines, legal action to compel entry, potential building condemnation, and personal liability for resulting damages or delays.

Structural Inspection

  • The purpose is to determine the general structural condition and safety for continued occupancy, with the scope defined by Phase One (visual) and Phase Two (testing) inspections.

  • Key components include the foundation, load-bearing walls, columns, beams, and roof/floor framing systems, focusing on signs of corrosion and spalling.

  • The inspection assesses current safety, not general code compliance, and is a much more in-depth, sealed, and liability-carrying assessment than a typical real estate home inspection.

  • It's assessed via visual checks for spalling/cracks, sounding (tapping) to detect delamination, and potentially Non-Destructive Testing (NDT) like Ground Penetrating Radar (GPR).

  • Evaluation includes membrane integrity, water intrusion evidence, flashing condition, and the structural support (trusses/decking) beneath the surface.

  • Corrosion is identified by visual inspection of rust indicators, measuring section loss thickness, and using scanning technologies to check for hidden deterioration.

  • Significant active water penetration, concrete spalling exposing rebar, large diagonal shear cracks, and noticeable beam/column sagging are immediate red flags.

  • Capacity is assessed by reviewing original design documents (if available), measuring deflection/settlement, and visually inspecting critical load path components for signs of overstress.

  • The 40-Year/Milestone Inspection covers the structural support around the elevator shaft and machine room, but the operational aspects of the elevator itself are covered by separate, mandatory annual/five-year vertical transportation safety inspections.

  • Materials testing (like core sampling) is not mandatory for Phase One but is often required during Phase Two testing if significant deterioration warrants quantifying strength or chloride content.

  • The most vulnerable elements are balconies, exterior concrete slabs, roof-to-wall connections, and foundation systems due to humidity, salt air, and high winds.

  • Key areas are the foundation, load-bearing elements (columns/beams/walls), roof framing, and connections between major components to assess current load capacity and stability.

  • es, technologies like Ground Penetrating Radar (GPR) are commonly used to detect hidden corrosion and moisture.

Certification of Compliance with Parking Lot Guardrails

  • This certification is required if the parking lot abuts a body of water (canal, lake, etc.) where a vehicle could roll into the water, as part of the Miami-Dade County/Broward recertification process.

  • Standards require guardrails to meet Florida Building Code load requirements (e.g., 200 lbs concentrated load) and must be certified compliant by a Florida P.E. or Architect on the official county form.

Electrical Inspection

  • The scope covers the main service entrance, panelboards, feeders, grounding systems, and emergency electrical features to ensure safety and compliance with the current NEC adopted by the Florida Building Code.

  • The outcome is a sealed report stating "Safe" (10-year certification) or listing deficiencies that must be repaired under permit to achieve certification.

  • Yes, emergency and exit lighting systems are a mandatory part of the electrical scope.

  • Yes, wiring insulation, routing, box fill, and grounding are visually verified for compliance and deterioration.

  • Generally, fire alarm/sprinkler systems are covered under separate life-safety code inspections, but the electrical power supply to these systems is reviewed in the 40-Year/Milestone inspection.

  • Safety is evaluated by checking grounding integrity, panel door security, proper overcurrent protection, and verifying emergency lighting functionality.

  • Yes, infrared thermography is commonly used to detect hidden electrical faults.

  • The purpose is to detect hidden thermal anomalies (hot spots) in energized high-amperage electrical equipment that indicate imminent failure or fire risk.

  • Yes, infrared thermography is highly effective at detecting invisible defects like loose connections, high resistance, and overloading in energized panels.

  • The Electrical Infrared Thermography Inspection is required for buildings with main electrical service rated at 400 amperes (400A) or greater.

  • No, the requirement applies to specific major electrical components such as switchgear, panelboards, disconnects, and transfer switches, as detailed in the code, not every single outlet or light fixture.

  • Yes, the equipment called out in the guidelines for thermographic inspection must be supplied by an electrical service of 400 amperes or higher, but the individual equipment to be inspected DOES NOT need to be rated at 400 amperes or higher.

  • The inspector must be a Level-II or higher certified infrared thermographer with over 5 years of experience inspecting commercial electrical systems.

  • Key areas are main service panels, grounding integrity, emergency/exit lighting, and the overall circuit load capacity relative to the building's needs.

Certification of Compliance with Parking Lot Illumination

  • It's important because it's a mandatory component ensuring public safety and security in parking areas for older commercial and multi-family buildings in specified counties.

  • Requirements include a licensed professional measuring illumination levels (foot-candles) to confirm they meet local code standards for safety and security.

  • For illumination, residential parking areas in unincorporated Miami-Dade County typically require a maintained minimum average of 1.0 foot-candle with a maximum-to-minimum ratio of 12:1.

Documentation and Reporting.

  • The sealed report must include the professional's written findings, photographic evidence, a description of all deficiencies, and a formal certification that the building is safe or details the required repairs.

  • Reports are submitted electronically via designated county portals or directly to the local building department within the legally specified timeframe.

  • Once successfully certified after the initial inspection and any required repairs, the recertification is valid for 10 years until the next milestone inspection is due.

  • Findings are supported by detailed field notes, measurement readings, and comprehensive photographic documentation of defects and system conditions.

  • Consequences are severe, including immediate fines (starting around $510 and escalating), liens on the property, referral to the Unsafe Structures Unit, and potential building evacuation orders.

Repairs and Certification.

  • Owners must obtain required permits and commence repairs within the jurisdiction-specific timeframe (often 60-180 days to begin, up to 365 days to complete substantial structural work).

  • Yes, generally, a building can remain occupied unless the specific deficiencies found are deemed an immediate threat to life safety, requiring an evacuation order.

  • No, a reinspection by the county is usually not required; instead, the original licensed engineer or architect must submit a final, sealed, amended report verifying all permitted repairs have been completed to code.

  • Yes, virtually all structural and electrical repairs resulting from the inspection require a formal building permit from the local municipality.

  • Contractors must be currently licensed by the Florida DBPR in the appropriate classification, carry required insurance, and be responsible for pulling all necessary repair permits.

  • The licensing board is the Construction Industry Licensing Board (CILB) under the DBPR, and verification is done on MyFloridaLicense.com.

  • Critical points are: (1) Permits must be pulled before work starts; (2) Only state-licensed contractors can perform the work; (3) The contractor pulls the permit; and (4) All work must pass final municipal inspection.

  • The timeline varies from 60 to 180 days for minor issues, but substantial structural repairs must commence within 365 days of the report date under state law.

  • Failure results in escalating fines, liens against the property, referral to the Unsafe Structures Unit, and potential mandatory evacuation.

Legal and Regulatory Requirements.

  • Regulation is governed by local codes (like Miami-Dade County Code Section 8-11(f)) and the Florida Building Code (Existing Buildings), now primarily mandated statewide by Florida Statute 553.899.

  • Yes, major updates were introduced by SB 4-D and HB 913, accelerating timelines to 25/30 years, mandating Structural Integrity Reserve Studies (SIRS), and strictly enforcing reserve funding.

  • No, the inspection only verifies current safety, but any required repairs must be done in compliance with the current adopted Florida Building Code in effect at the time of repair.

  • The property owner or the condominium/cooperative association is legally responsible for initiating the inspection process by hiring the qualified professional.

  • The deadline for owners to submit the completed inspection report is typically 90 days after receiving the official Notice of Required Inspection from the local jurisdiction.

  • Penalties start with immediate citations and fines ($510+) that can escalate daily up to $10,000, followed by property liens and possible condemnation.

  • No, older, non-compliant inspections are not accepted; the submission must be the current, signed, and sealed report meeting the latest regulatory requirements.

  • Legal risks include personal liability for accidents resulting from unaddressed issues, breach of fiduciary duty for board members, and the inability to obtain insurance coverage or sell the property.

  • Yes, non-compliance severely affects sales by making it difficult to secure financing and lowering buyer confidence due to the uncertainty of required, costly repairs.

  • If condemned, an immediate mandatory evacuation order is issued, rendering the property uninhabitable until all required repairs are completed and approved via reinspection.

  • Yes, compliance status, violations, and final inspection reports are typically entered into public online search portals managed by the city or county building department.

Compliance and Enforcement.

  • Local city and county Building Departments (or Code Enforcement Divisions) are the primary enforcing agencies, referring severe issues to Unsafe Structures Units.

  • Non-compliance triggers fines, liens, and the potential for the building to be declared unsafe and subject to mandatory evacuation.

  • Yes, owners have the right to appeal violation notices or decisions from the building official through the local Board of Rules and Appeals (BORA) or a Special Magistrate.

  • To appeal, the owner must file a formal written appeal with the local Board of Rules and Appeals (or equivalent) within a strict, short deadline (e.g., 30 days) and often must support it with a second professional inspection report.

Special Cases and Miscellaneous.

  • Renovations don't waive the recertification requirement, but any unpermitted work discovered must be legalized, and major structural renovations often require re-inspection of the modified areas.s.

  • Yes, demolition is an option if the building is deemed unsafe or if the cost of required repairs exceeds a legally defined percentage (often 50%) of the building’s value.

  • Yes, short-term extensions (usually 60 days) are possible but require a formal request supported by a licensed professional certifying temporary safety.

  • Yes, deadline extensions are usually granted for both the 40-year building recertification and the Florida milestone inspections, but they are not automatic. The process is handled by the local building official and requires a formal request with specific documentation. 

    How to Obtain an Extension

    • Formal Written Request: The property owner or association must submit a written request for an extension to the local city or county building department.

    • Professional Certification: The request must be submitted or co-signed by the hired Florida-registered professional engineer or architect who is contracted to perform the inspection.

    • Statement of Safety: The professional must provide a signed and sealed statement confirming that, in their professional opinion, the building is safe for continued occupancy while the inspection or repairs are underway. 

    Typical Extension Durations

    • Inspection Report Submission: Local municipalities typically grant a one-time extension of up to 60 days to submit the final inspection report.

    • Repair Completion: If the report identifies structural deficiencies, extensions for completing repairs are often granted, especially for large, complex projects like concrete restoration. These extensions require proof that work is in progress, permits have been obtained, or that a contract for work is in place. 

    Key Deadlines Recently Extended by Legislation

    Florida House Bill 913 (HB 913), enacted in 2025, provided a one-time, state-wide extension for some key deadlines: 

    • The deadline for completing the initial Milestone Structural Inspections for certain buildings was extended to December 31, 2025.

    • The deadline for completing Structural Integrity Reserve Studies (SIRS) was also extended to December 31, 2025

    Summary

    Extensions are possible but are generally short-term and contingent on showing due diligence (having a professional under contract) and certifying the building's temporary safety. It is crucial to act quickly and formally request the extension before the original deadline to avoid severe penalties and fines. 

  • Common reasons are professional scheduling delays or time needed to obtain permits for repairs; apply by submitting a written request with a signed, sealed safety statement from the design professional before the original deadline.

  • TCompliance ensures insurability and financing viability; non-compliance can lead to voided policies, denied mortgages, and significant devaluation during a sale.

  • Yes, flood zones often mandate stricter requirements for guardrails (Certification of Compliance) and may impose tougher repair standards (bringing damage repairs up to current flood codes).

Service Area.

Miami-Dade County and all municipalities, including these main cities:

📞 Ready to Ensure Compliance? Get Your Inspection Quote Today.

Protect your investment and meet mandatory deadlines. Our licensed professionals ensure full compliance with local codes.

All Home Meters LLC: Your Florida Recertification Experts.

40-year-recertification-miami-dade-county-city-of-hialeah-beach-homestead-doral-coral-gables-All-home-meters-llc-florida-engineering-company-registry-28738.jpg